Business and private temporary storage industrial flooring by Prima
We carried out the industrial flooring for the EasyBox Self Storage located in Via Montefeltro, Milan, on behalf of PLT Costruzioni.
What we did:
- a 6 to 8 cm thick collaborative hood for the reception, office and toilet inter-floor slab (ground floor and first floor) and for the multi-storey building and underground car park. A 6 to 10 cm thick roof slab for the underground car park ramp.
- a 18 cm thick concrete floor in the underground storage and loading bay (basement)
- a 12 to 14 cm thick concrete floors in the intermediate storage and loading areas (ground, first, second, third, fourth and fifth floors)
